The machine builder quotes cylinders and valves. The facilities team pays for the compressed air that moves them. When a new line is added, the first team needs enough pressure at the machine, while the second needs to know when, and for how long, the extra demand occurs. Start at PTC ASIA 2027 with the machine cycle; take the resulting demand figures to ComVac ASIA if the plant’s spare capacity is uncertain. Both shows run on 27–30 October at the Shanghai New International Expo Centre.
Ask for air per cycle and air at the busiest instant
PTC’s pneumatic categories include cylinders, valves, controls and air preparation. Bring the proposed sequence of movements, expected loads, cycle time and the number of stations that can run together. Identify any cleaning or blow-off step that draws air separately. Two identical cylinders firing together and two firing several seconds apart can use the same amount per cycle but create different short peaks.
Ask the machine supplier to mark which movements coincide and give three figures: typical air use per completed cycle, peak flow with its duration, and minimum pressure required at the machine inlet during motion. Have the supplier state the reference conditions and units behind its flow figures. A monthly air bill can help estimate cost, but it cannot tell you whether pressure will dip during a one-second demand spike.
Take the shift pattern to the compressor supplier
ComVac covers compressors and downstream air treatment. Alongside the proposed line’s figures, bring whatever pressure and flow measurements you already have for a busy shift and for idle periods. Note where each reading was taken: pressure at the compressor outlet and pressure at the far end of the line answer different questions.
Ask for two cases. In the first, the plant has sufficient average capacity but pressure drops briefly when stations move together. In the second, demand exceeds available supply throughout the busy shift. What measurements would distinguish them? Could a restriction or a pressure loss across treatment or distribution equipment explain the first case? Which costs, including power use and servicing, would change in the second? A supplier who separates the cases gives your facilities team a reason to investigate before budgeting for another compressor.
For a like-for-like replacement cylinder on an unchanged line with documented performance, stay with the component supplier and confirm fit, seal material and lead time. For a new or expanded line, leave Shanghai with the same demand sheet in both suppliers’ hands and a named person to measure pressure at the machine during a representative shift. That measurement gives both sides a shared starting point for a firm offer.
Official sources
- PTC ASIA: dates and venue
- PTC ASIA: pneumatic products and controls
- ComVac ASIA: 2027 dates, venue, compressors and air treatment
Checked on 25 November 2026. Confirm technical appointments and hall locations with the organisers and suppliers.