The camera catches every missing clip when an operator lays the housing flat. On the conveyor the same housing arrives tilted, and the clip sometimes disappears behind a lip. At IAS Shanghai 2027, separate the question of seeing the defect from the question of presenting the part. IAS and its parent, China International Industry Fair, run on 20–24 September at Shanghai’s National Exhibition and Convention Center. Add the fair’s Robotics Show section if the part still needs to be turned or repositioned after the inspection method is understood.
Find out what the camera can actually distinguish
Take labelled examples of good parts, known defects and borderline cases whose disposition your quality team has agreed. Include ordinary variations in colour, gloss and orientation. Show suppliers where the inspection takes place, what triggers it and how long the part is in view. IAS covers industrial image processing, sensors and controls, so a lighting or timing question can be taken to the right specialist without changing shows.
Ask to review the images behind individual decisions. Count good parts rejected separately from bad parts accepted: one loses output, the other releases a defect. Keep a few labelled samples outside the setup set and discuss how a later trial will use them. A stand demonstration is useful for choosing an approach, but does not establish a production error rate.
Check whether the part needs a robot at all
If the defect is consistently visible when the part rests against a simple stop, ask a fixture or conveyor supplier about repeatable positioning. If the defect sits underneath a flange on some models, an extra camera or a different lighting angle may still be simpler than picking up every part. Take the problem to the CIIF Robotics Show when a second pose is genuinely needed and the product mix makes fixed tooling unattractive.
Give the handling supplier the heaviest and most awkward parts, the permitted grip surfaces, the incoming orientation and the time available to present each view. Ask how the part gets back onto the line if the image is inconclusive. A quoted pick time is not the duration of the whole operation: include gripping, settling, image capture and release. Book a follow-up with actual parts if the proposed movement cannot be shown at the fair.
Follow one rejected part to its destination
On a single sketch, mark the trigger, image decision, part identity and confirmation that the rejected item has reached the correct bin. Ask who supplies and checks each signal and how operators recognise a missing image or unconfirmed rejection. Request one trial proposal covering the sequence, with the vision supplier and handling integrator named against their tasks. If part presentation is already stable, the better use of the remaining visit is to agree the trial with the IAS supplier rather than to price a robot.
Official sources
- IAS: dates and venue and organiser’s product categories.
- CIIF Robotics Show and IAS organiser’s concurrent exhibitions.
Information checked on 26 November 2026. Confirm relevant stands and sample-trial arrangements before booking meetings.