A building operator wants to use more of its rooftop solar generation after the afternoon shift. One supplier quotes energy stored in a battery cabinet; another quotes power available at the building. Those figures answer different questions. At WBE 2027, make the battery offer answer your building’s load first. Visit the Solar PV & Energy Storage World Expo for the converter and integration price if they are outside that offer. Both exhibitions run 13–15 August at Guangzhou’s Canton Fair Complex.
Put the building meter on the quotation
Bring a representative day’s solar generation and consumption in the same time intervals. Mark the surplus the site could store and the hours when it needs that energy back. For example, supplying an extra 50 kW for two hours means delivering 100 kWh on the building side. A cabinet labelled 100 kWh nominal is not a promise to deliver that amount: ask what operating reserve is assumed and where conversion losses and auxiliary consumption are counted. The example describes the load, not the battery size to order.
WBE’s scope runs from cells and packs to complete commercial storage cabinets. Identify the exact cabinet configuration, the continuous power it can supply, the usable energy at the stated measurement point and which converter, if any, is included. Ask the seller to state the operating conditions behind each figure. That makes it possible to compare two offers even when only one includes the power conversion equipment.
Leave the PV meeting with a named equipment pair
If the design retains an existing solar inverter, take its model and the installer’s outline of the proposed connection to the PV fair. An offer for a new hybrid inverter may assume that the existing unit will be replaced; a separate battery converter may leave it in place. Ask each supplier to mark retained, replaced and additional equipment on the same outline. Otherwise a seemingly cheaper cabinet may simply be missing a converter or a second installation visit.
Have the battery and converter suppliers identify the models and supported software versions in writing, then identify who will commission that combination and respond if the two devices stop communicating. Compare the total equipment and commissioning price with a single-supplier system measured at the same point. If your installer already supports the exact cabinet–converter pair and has priced the work, a second fair adds little. Buyers selecting cells for an existing pack design can likewise keep their time at WBE.
Official sources
- WBE organiser: 2027 dates, commercial storage systems and concurrent PV show
- PV Guangzhou: 2027 visitor guidelines
- Solar PV & Energy Storage World Expo: official event site
Checked and updated: November 26, 2026.