Ask flooring suppliers for the installed height at the threshold. Consult a door supplier only if the approved door detail does not settle the clearance.

A flooring quote that leaves out a few millimetres of backing or adhesive can put a shop entrance at the wrong height. At DOMOTEX asia/CHINAFLOOR, 26–28 May 2027 at Shanghai’s National Exhibition and Convention Center, price the floor at its installed height. Bring the approved door detail if you have one. If you are also buying the door and its clearance is unresolved, a supplier at R+T Asia, held there on the same dates, can mark up the same section.

Buy the installed floor, not just the top layer

DOMOTEX lists wood floors, resilient products, mats, carpet tiles and installation technology. For a lobby with a recessed mat inside a sliding entrance and resilient flooring beyond it, draw the route from outside to inside. Mark the structural slab, the proposed finished level and where the mat frame meets the next finish. Give competing suppliers the same drawing, expected traffic and cleaning method so they are quoting the same part of the entrance.

Ask each for a section through the proposed product, including its backing and whichever adhesive, underlay or support its installation requires. A loose tile gives a colour and a product thickness; it does not tell the door contractor where the finished surface will be. Attach the sample code to the drawing, record the overall installed thickness, and ask who prices preparation of the substrate, the frame or the edge trim. Then a lower square-metre rate can be read alongside the work it leaves to someone else.

Ask the door supplier to draw on the same section

R+T Asia lists commercial automatic doors, pedestrian doors and sliding glass doors. If the clearance is still open, take the drawing and the shortlisted flooring section to a supplier offering the door type specified. Ask the supplier to mark the finished-floor reference line, any sill or recess, the position of any floor guide, and the clearance the proposed door requires. Ask how the mat or adjacent finish can be replaced without blocking access to that hardware.

A useful answer is specific enough for the project team to compare two options. For example, one proposal may include a sill while another leaves a recessed component for the site contractor. Have each supplier mark who provides the part, who forms the recess, and what dimension must be confirmed before the door is ordered. The buyer can then request a price for the missing work instead of treating an incomplete package as the cheaper entrance.

Decide what is ready to price

By the end of the visit, send the flooring section, door detail, sample references and open dimensions to the project designer and installer as one set. Ask them to check the actual site levels, accessibility requirements and proposed junction before approving fabrication. A workable detail on the stand is a reason to develop a quotation, not site approval.

For a distributor buying stock flooring by pattern, wear layer or carton quantity, the door meeting adds little: return to the DOMOTEX shortlist for replenishment terms and matching trims. The same applies when the door has already been selected and its approved threshold drawing is available. In that case, take the drawing straight to the flooring suppliers; another door quotation would answer a question the project has already settled.

Sources

Information checked on 25 November 2026. Confirm the current hall plan and admission arrangements with each organiser before setting meeting times.

Turn a show visit into a focused sourcing plan.

We can connect event selection with exhibitor research, interpretation, meetings and post-show supplier follow-up.

Discuss Your Plan
Chat with us